{"id":505,"date":"2015-09-19T11:01:40","date_gmt":"2015-09-19T10:01:40","guid":{"rendered":"https:\/\/stichtingmilijuli.org\/wordpress.php\/?page_id=505"},"modified":"2023-05-23T10:08:04","modified_gmt":"2023-05-23T09:08:04","slug":"505-2","status":"publish","type":"page","link":"https:\/\/stichtingmilijuli.org\/wordpress.php\/505-2\/","title":{"rendered":"Hydro-Electric Central Duble"},"content":{"rendered":"<header class=\"entry-header\">\n<h1 class=\"entry-title\">Hydro-Electric Central Duble<\/h1>\n<\/header>\n<div class=\"entry-content\">\n<p>Hydroelectric Duble. In 2008 there were already plans for a hydroelectric plant. But especially during the dry summers, according to various calculations and measurements are not met the minimum three kilowatt. This amount was certainly necessary to all homes in Duble provide enough electricity. Therefore, the focus remained on solar panels for all homes.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-167 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy-300x200.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy-1024x683.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy-272x182.jpg 272w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5631-Copy.jpg 2040w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>End of 2013, 25 homes would be equipped with the new latest generation solar panels and after an offer was previously transferred the money. Shortly after that came a call from Kame Sherpa from Duble. There had been a village meeting and it was unanimously in favor of a hydroelectric plant. It was assured that it had sufficient chance of success. There were seven houses are equipped with solar panels planned and the remaining money would be used for hydroelectric power.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0832-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-161 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0832-Copy-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0832-Copy-300x225.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0832-Copy-1024x768.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0832-Copy.jpg 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>After an emergency meeting within the board, it was decided to cooperate.In March 2014 left Anita and Jan to Duble and after a warm reception they were told that the hydroelectric plant was officially put into use. The next day there was a ceremony which was attended by almost all the inhabitants of the area. At the local river was a new stone building. There were prayer flags and a banner made for this opening hung. The ceremonial part consisted of a Lama who blessed the plant with incense and Tibetan prayers As a surprise came a group of three dressed Imanen that the water gods voted favorably by frenzied dancing and singing.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0841-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-158 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0841-Copy-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0841-Copy-300x225.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0841-Copy-1024x768.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0841-Copy.jpg 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>After the cutting of a ribbon, were allowed into the building of the hydroelectric power, the taps are turned and started to walk several meters on. There was added to the end of the dry season has now been achieved even 5 kW!<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-213 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy-225x300.jpg 225w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy-768x1024.jpg 768w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy-300x400.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0866-Copy.jpg 1500w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>The stone building was about 4 x 6 meter and the hydroelectric plant consisted of a metal container containing an impeller, where on two sides by water was sprayed from iron pipes. The metal container was the generator that electricity was generated, which was conducted with power to the home. Every connected household annually paid a fee to pay for maintenance and a person\u2019s hydroelectric opens and closes each day.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0946-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-211 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0946-Copy-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0946-Copy-300x225.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0946-Copy-1024x768.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_0946-Copy.jpg 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Of course, by the company was checked throughout the water pipes, consisting of a plastic tube leading from the iron pipes, nearly perpendicular against the mountain side went up. At about 50 meters we had a 2.5 meter high container brickwork of about 3 x 6 meters, where water was collected came from three pipes. Via a grid ran the water in the plastic tube to the building. Also, they had an overflow through a tube that was standing in the box and just below the rim, the excess water through a plastic tube 2 brought back to the river. The 3 tubes were found each in different places and tens of meters upstream water to absorb.<a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-164 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy-300x200.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy-1024x683.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy-272x182.jpg 272w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2015\/08\/IMG_5605-Copy.jpg 2040w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>This one was even in the dry season still plenty of water. There were even some homes adjacent to Duble, with power. The Jana Yoti school in Duble and monestry were also connected to the network. The hydroelectric project can be considered very successful.<\/p>\n<\/div>\n<p>In 2022, a severe storm ravaged Okhaldhunga District, severely damaging the plastic<br \/>\npipes of the Duble hydroelectric power station.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1334 aligncenter\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1-1024x460.jpg\" alt=\"\" width=\"700\" height=\"314\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1-1024x460.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1-300x135.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1-768x345.jpg 768w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1-1536x690.jpg 1536w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/buizen-kapot-2-1.jpg 2048w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<p>The residents who are connected to the power grid of this power station then decided to<br \/>\nreplace these plastic pipes with concrete gutters.<br \/>\nThe Milijuli Foundation provided a financial amount to get enough cement bags from<br \/>\nKathmandu on site.<\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1333\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1-1024x768.jpg\" alt=\"\" width=\"700\" height=\"525\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1-1024x768.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1-300x225.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1-768x576.jpg 768w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1-1536x1152.jpg 1536w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/2-nieuwe-waterweg-1.jpg 2048w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1339\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1-1024x768.jpg\" alt=\"\" width=\"700\" height=\"525\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1-1024x768.jpg 1024w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1-300x225.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1-768x576.jpg 768w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1-1536x1152.jpg 1536w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/kiezel-maken-voor-de-beton-1.jpg 2048w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><br \/>\nIn recent weeks, dozens of meters of concrete gutters have been built by various<br \/>\nvolunteers. The hydroelectric power station now has sufficient water capacity to provide<br \/>\nelectricity to approximately 80 families, as well as the Jana Jyoti school and the<br \/>\nMonastery.<\/p>\n<div class=\"entry-content\">\n<p><a href=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1332\" src=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1-768x1024.jpg\" alt=\"\" width=\"700\" height=\"933\" srcset=\"https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1-768x1024.jpg 768w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1-225x300.jpg 225w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1-1152x1536.jpg 1152w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1-300x400.jpg 300w, https:\/\/stichtingmilijuli.org\/wp-content\/uploads\/2023\/05\/1-nieuwe-waterweg-1.jpg 1536w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hydro-Electric Central Duble Hydroelectric Duble. In 2008 there were already plans for a hydroelectric plant. But especially during the dry summers, according to various calculations and measurements are not met the minimum three kilowatt. This amount was certainly necessary to all homes in Duble provide enough electricity. Therefore, the focus remained on solar panels for <a class=\"moretag\" href=\"https:\/\/stichtingmilijuli.org\/wordpress.php\/505-2\/\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"full-width-page.php","meta":{"footnotes":""},"class_list":["post-505","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/pages\/505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/comments?post=505"}],"version-history":[{"count":8,"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/pages\/505\/revisions"}],"predecessor-version":[{"id":1357,"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/pages\/505\/revisions\/1357"}],"wp:attachment":[{"href":"https:\/\/stichtingmilijuli.org\/wordpress.php\/wp-json\/wp\/v2\/media?parent=505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}